First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

    • ephemeral_gibbon@aussie.zone
      link
      fedilink
      English
      arrow-up
      2
      ·
      2 年前

      Ah sorry, my mistake. I messed up there.

      The battery in SA is really just for grid stabilisation, not long term storage. Batteries are not really a good soln for longer duration storage. You need surprisingly little storage though when they’ve modelled fully renewable grids which is why the projected costs aren’t stupidly expensive.

      • ZodiacSF1969@lemmy.world
        link
        fedilink
        English
        arrow-up
        1
        ·
        2 年前

        That’s interesting, I’m an EE but in industry atm. I’d like to look into that whole scenario one day and see how much storage we’d need to go fully renewable.